Removal of Overhead Concrete Bridge Over an 8-Lane Highway Without the Use of Detours
Annual conference, Canadian Society for Civil Engineering ; 1996 ; Edmonton; Canada
01.01.1996
14 pages
Incorporating the 1st Structural speciality conference, the 1st Transportation speciality conference and the 1st Environmental engineering speciality conference. Complete in 6 vols, vol 2b not yet rec'd; The 1st environmental engineering speciality conference, also reffered to as being the 4th
Aufsatz (Konferenz)
Englisch
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Widening and resurfacing the King Edward highway without detours
Engineering Index Backfile | 1926
|Building city roads without traffic detours
Engineering Index Backfile | 1927
|Six-lane highway bridge over Welland river
Engineering Index Backfile | 1940
|Online Contents | 2009