Scour Consideration for Bridge Foundation in Bouldery River Bed - Case Study
INDIAN HIGHWAYS ; 31 ; 43-58
01.01.2003
16 pages
Aufsatz (Zeitschrift)
Englisch
DDC: | 625.7 |
© Metadata Copyright the British Library Board and other contributors. All rights reserved.
Ranga-I Bridge Pier Scour In Bouldery Bed - A Case Study
HENRY – Bundesanstalt für Wasserbau (BAW) | 2004
|Tidal Bridge Scour in a Coastal River Environment: Case Study
HENRY – Bundesanstalt für Wasserbau (BAW) | 2010
|Investigating Subsurface Conditions in Bouldery Terrain-Lessons from the Field
British Library Conference Proceedings | 2006
|Detailing of Cutting Edges for Cassion/Well in Bouldery Strata
British Library Online Contents | 2007
|Investigating Subsurface Conditions in Bouldery Terrain-Lessons from the Field
British Library Conference Proceedings | 2006
|