The North Carolina State Ports Authority (NCSPA) has undertaken improvements to its Morehead Port berth facilities, to better serve the deeper draft vessels utilized in today's shipping industry. In general, the improvements include a layer of tieback to aid in carrying additional live loads from a recently constructed warehouse, and a combination of additional layers of tiebacks and a king pile wall system to stabilize the existing wall during the future removal of an existing rock berm and dredging along approximately 213.4 meters (700 feet) of the mudline to a deeper elevation. The Ports Authority commissioned an engineering study to determine a feasible approach to accomplish the improvements. The engineering study included a subsurface exploration to assess the subsurface profile, engineering properties of the in-situ soils, and configuration of an existing relieving platform behind the current wall system. The subsurface profile model was utilized in a detailed soil-structure interaction (SSI) analysis to design the new wall system. The design of the new wall system implemented innovative methodologies and construction sequencing to minimize the effects of the new wall on the existing wall system and warehouse. This paper highlights key features of the project. It describes the background information; project description; the design methodologies; soil exploration and determination of engineering parameters used in the SSI analysis of the new wall system; and incorporation of practical construction issues in the design.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Evaluation and Design for Wharf Berth Improvements


    Beteiligte:

    Kongress:

    12th Triannual International Conference on Ports ; 2010 ; Jacksonville, Florida, United States


    Erschienen in:

    Ports 2010 ; 836-845


    Erscheinungsdatum :

    22.04.2010




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Evaluation and Design for Wharf Berth Improvements

    Barrett, X.C. / Das, S. / Wells, R.C. et al. | British Library Conference Proceedings | 2010


    Port Canaveral North Cargo Berth 5 & 6 Wharf

    Vieira, Anthony L. / Ledford, Gary D. / Rice, Sandra D. et al. | ASCE | 2013


    Seismic Design of Port of Los Angeles Berth 144 Wharf

    Weismair, M. / Sahrestani, S. / Lim, A. et al. | British Library Conference Proceedings | 1998


    Tower crane device applied to wharf berth engineering construction

    LI ZHIMIN / JIANG LINGFENG / GAO JINGJING et al. | Europäisches Patentamt | 2025

    Freier Zugriff

    Design and Construction of Berth IV Marginal Wharf at Seagirt Marine Terminal

    Shafer Jr., Thomas / Knott, Michael / Joines, Nicholas | ASCE | 2013