Subway running tunnel construction is rather difficult when using an earth pressure balance shield in alternating hard and soft rock strata for problems of dealing with full-face hard rock, upper-soft lower-hard ground, full-face soft rock, and the interface of hard and soft rock. In response to these technical problems, taking measures of theoretical analysis, indoor tests, and combined with engineering practice, we studied the three following matters:construction parameters for shield tunnels in different strata, the building settlement law, and countermeasures and construction technology for shield tunnels in complex strata. The main conclusions are as follows: (1) shield tunnel construction is demanding of a shield machine in alternating hard and soft rock strata such that the shield machine should have the ability to drive in hard rock and soft soil, preventing spewing, overbreak, etc.; (2) technical countermeasures and construction parameters of different strata are presented by cutting tools, driving mode, driving parameters, etc., and (3) all measuring points are affected by secondary disturbance when the rear shield passes buildings and the sedimentation value increases, which accounts for 45-66% of the final settlement.
Technical Measures of Shield Tunnel Construction in Alternating Hard and Soft Rock Strata
10th Asia Pacific Transportation Development Conference ; 2014 ; Beijing, China
05.05.2014
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Europäisches Patentamt | 2024
|Study on Blasting Characteristics of Shallow and Deep Soft-hard Rock Strata Based on Energy Field
Springer Verlag | 2023
|Options and risks for hard rock shield TBM
IuD Bahn | 2007
|