Runway 4-22 at William P. Hobby Airport, Houston, Texas was constructed using Continuous Reinforced Concrete pavement in 1989. During construction, unconsolidated concrete was discovered in the northern and southern ends of the runway. This unconsolidation was confined to the bottom 10 cm (4") of the pavement. Improper vibration techniques were determined to be the cause. A current design project will perform repairs to these areas, which will prolong the life of the pavement to the full 20-year life.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Assessment and Repair of Runway 4-22 at Hobby Airport, Houston


    Beteiligte:

    Kongress:

    27th International Air Transport Conference ; 2002 ; Orlando, Florida, United States



    Erscheinungsdatum :

    30.11.2002




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch




    Pavement Reconstruction of Main Runway Intersection at William P. Hobby Airport

    Godiwalla, Adil M. / Wengler, Frank R. / Bush, John E. | ASCE | 2004


    Pavement Reconstruction of Main Runway Intersection at William P. Hobby Airport

    Godiwalla, A. M. / Wengler, F. R. / Bush, J. E. et al. | British Library Conference Proceedings | 2003



    Rehabilitation of Runway 9-27 at Intercontinental Airport of Houston (IAH)

    Godiwalla, A. / Treybig, H. J. / Little, D. | British Library Conference Proceedings | 2000


    New North Parallel Runway 8L-26R at Bush Intercontinental Airport of Houston

    Godiwalla, A. / Transportation & Development Institute | British Library Conference Proceedings | 2003