During the process of a traditional freight station being transformed to a logistics center, problems must be faced when station work operations do not adapt and transport equipment is not matched to all of the process logistics demands. This paper discusses the present problems and transformation strategies of a railway freight station development with all of the process logistics. At the same time, with a typical traditional freight station as an example, an analysis of the problems of a railway freight station transforming to a logistics center is put forward. The improvement plan includes updated handling equipment for the station and cooperation with the third party logistics, finally coming to reference conclusions through this example.


    Zugriff

    Zugriff prüfen

    Verfügbarkeit in meiner Bibliothek prüfen

    Bestellung bei Subito €


    Exportieren, teilen und zitieren



    Titel :

    Analysis of Adaptability to Railway Freight Station for All Process Logistics


    Beteiligte:
    Tan, Yinying (Autor:in) / Wang, Mengtao (Autor:in)

    Kongress:

    2014 International Conference of Logistics Engineering and Management ; 2014 ; Shanghai, China


    Erschienen in:

    ICLEM 2014 ; 225-231


    Erscheinungsdatum :

    17.09.2014




    Medientyp :

    Aufsatz (Konferenz)


    Format :

    Elektronische Ressource


    Sprache :

    Englisch