Objective To meet the requirements of external entities for accessing video surveillance images from Shanghai rail transit system, and to ensure the normal, stable and secure transmission of these images, it is necessary to study the docking scheme between Shanghai rail transit technical security system and external systems. Method Starting from the architecture of Shanghai rail transit technical security system, the docking scheme between Shanghai rail transit technical security system and external systems is further elaborated based on an analysis of the challenges and key points for system docking, and the calling process of the docking scheme is described through specific call cases. Result & Conclusion The docking scheme between Shanghai rail transit technical security system and external systems features a simple logical architecture, clear system boundaries, and a high level of network security protection, effectively meeting the needs of external entities for accessing Shanghai rail transit surveillance images.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Docking Scheme of Shanghai Rail Transit Technical Security System with External Systems


    Beteiligte:
    REN Jiarong (Autor:in) / DONG Wei (Autor:in)


    Erscheinungsdatum :

    2024




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt





    Docking type rail transit system and operation method thereof

    DI BENJIAN | Europäisches Patentamt | 2016

    Freier Zugriff

    Urban Rail Transit Operation during World Expo 2010 Shanghai

    Zhu, Wei | Trans Tech Publications | 2012


    Research on Characteristics of Shanghai Rail Transit Commuter Flow

    WANG Bo / ZHANG Tianran / ZI Haibo et al. | DOAJ | 2024

    Freier Zugriff