The article discusses the results of simulation at the macro level of the scenario of the Trans-Siberian railway transfer outside the Tyumen. The authors give the analysis of changes in the traffic parameters calculated in the PTV VISUM program for the morning time of the day at the current moment for the option of transferring the railway from the city, and consider the options for increasing the completeness and accuracy of the modeling results for this option of infrastructure development.
Transport modelling application in assessing the efficiency of the Trans-Siberian Railway transfer beyond the borders of the city of Tyumen
2021