The building density of Central Business District (CBD) is usually high. Land for a bus terminal is insufficient. In this situation, passengers in CBD have to walk far to take a bus, or take a long time to wait for a taxi. To solve this problem, this paper proposes an indirect approach: the design of a circle line of shuttle bus as a dynamic bus terminal in CBD. The shuttle bus can deliver people to the bus station through a circle line. This approach not only reduces the traffic pressure in CBD, but also saves travel time of the passenger. A bi-objective model is proposed to design a circle line of a shuttle bus for CBD. The problem is solved by non-dominated sorting genetic algorithm (NSGA-II). Furthermore, the Dalian city in China has been chosen as the case study to test the proposed method. The results indicate that the method is effective for circle line optimization of shuttle bus in central business district without a bus terminal.


    Zugriff

    Download


    Exportieren, teilen und zitieren



    Titel :

    Circle Line Optimization of Shuttle Bus in Central Business District without Transit Hub


    Beteiligte:
    Baozhen Yao (Autor:in) / Qingda Cao (Autor:in) / Lu Jin (Autor:in) / Mingheng Zhang (Autor:in) / Yibing Zhao (Autor:in)


    Erscheinungsdatum :

    2017




    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Elektronische Ressource


    Sprache :

    Unbekannt




    Restructuring from a Central Business District–Focused to a Decentralized Transit System

    Bhattacharya, Torsha / Brown, Jeffrey R. / Jaroszynski, Michal et al. | Transportation Research Record | 2013



    Circle rail transit line timetable scheduling using Rail TPM

    Zhibin, J. / Jia, G. / Ruihua, X. | British Library Conference Proceedings | 2010


    SHUTTLE/TRANSIT BUS WITH LOW FLOOR

    HINES BARRY ROY / TETZLOFF KELVIN / ROBERTS DONALD WAYNE | Europäisches Patentamt | 2018

    Freier Zugriff

    Parking for Central business district

    Klaber, E.H. | Engineering Index Backfile | 1953