2 1/8 mi expressway passes under 5 streets, 2 railroads and 2 pedestrian crossings; two 24 ft pavements are separated by 15 ft sodded median or by raised concrete median 6 ft wide; three colors of concrete are used for safety; data on lighting and drainage; general description of concrete bridges; total cost $8,045, 000.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Speeding up San Antonio traffic


    Weitere Titelangaben:

    Eng News-Rec


    Erschienen in:

    Engineering News-Record ; 143 , n 24 ; p 32-34


    Erscheinungsdatum :

    1949


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Speeding traffic with light signals

    Egeler, C.E. | Engineering Index Backfile | 1926



    SPEEDING, SPEED LIMITS AND TRAFFIC SAFETY

    Zlender, B. / Arneric, N. / Ferligoj, A. et al. | British Library Conference Proceedings | 1998