Elgin, Joliet and Eastern is butt welding approximately 15 track mi; completion of work will give this road, which has total of only 277 mi of main track, nearly 41 track mi of continuous welded rail, all in open main tracks; illustrated description of manner in which this work is accomplished.
Chicago being ringed with welded rail
Ry Age
Railway Age ; 125 , n 12
1948
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Springer Verlag | 1986
|Online Contents | 2008
IuD Bahn | 2008
|Engineering Index Backfile | 1960
|Engineering Index Backfile | 1942
|