Installation of centralized traffic control increases capacity of remaining 137 mi of single track; use of power switches for sidings, signaling, switch mechanism and train stop system, and control machine described.
C.T.C. on southern frees 48 miles of second track
Ry Age
Railway Age ; 133 , n 13 ; p 52-55
1952
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Southern Pacific installs C.T.C. on 72 miles of single track
Engineering Index Backfile | 1945
Kansas City Southern installs C.T.C. on 46 miles of busy single track
Engineering Index Backfile | 1945
Kansas City Southern installs C.T.C. on 46 miles of busy single track
Engineering Index Backfile | 1945
Missouri Pacific installs C.T.C. on 82.66 miles of single track
Engineering Index Backfile | 1950
C.T.C. on 107 miles of single-track on Rio Grande
Engineering Index Backfile | 1943