Development and proposed plan of vehicular tunnel under River Mersey connecting Liverpool and Birkenhead; four lines of traffic; ventilation system; anticipated completion in 1931. (Supp.)
New road tunnel under the Mersey
Modern Transport
Modern Transport ; 19 , n 479
1928
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
Engineering Index Backfile | 1931
|The "Quennsway" Mersey tunnel extrance control project
Tema Archiv | 1974
|Mersey Tunnels Kingsway Tunnel fire incident 15 October 1994
British Library Conference Proceedings | 1995
|An analysis of vehicle breakdowns in the Mersey Tunnel
TIBKAT | 1972
|