Annual operating costs prior to and after electrification are given in accompanying cost statement; all electric power is purchased from Kansas City Power and Light Co. at primary rate and is metered at outdoor substation; motor-driven equipment replaced steam-driven units; motor-driven water-service pumps; turntable was also electrified; motor-driven yard air compressors provided.
Purchased power effects $5,190 annual saving at Burlington yard
Ry. Elec. Engr
Railway Electrical Engineer ; 19 , n 2 ; p 45-48
1928
4 pages
6 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Burlington installs new classification yard at Lincoln, Neb
Engineering Index Backfile | 1945
|Burlington installs new classification yard at Lincoln, Neb
Engineering Index Backfile | 1944
|Automatic classification yard in service on Burlington at Chicago
Engineering Index Backfile | 1958
Burlington installs new westbound classification yard at Galesburg, Ill.
Engineering Index Backfile | 1943
|Burlington expands largest yard to meet war-time demands
Engineering Index Backfile | 1943