Careful planning permits erection of new freight house and rearrangement of tracks with little interruption to service; brick and concrete in-bound freighthouse, office building, 60 ft. long, with adjoining one-story building 60 ft. by 80 ft., of similar construction; covered outbound freight platform, 24 ft. wide by 660 ft. long of wood construction; automobile platform and gantry crane, together with necessary tracks, driveways, and water and sewer connections.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Northern pacific remodels freight facilities at Spokane, Wash


    Weitere Titelangaben:

    Ry. Age


    Erschienen in:

    Railway Age ; 85 , n 3


    Erscheinungsdatum :

    1928


    Format / Umfang :

    2 pages


    Anmerkungen:

    3 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Extensive grade separation at Spokane, Wash.

    Engineering Index Backfile | 1916





    IAEA remodels regulations

    British Library Online Contents | 1997