Progress made in work of electrifying Midi Railway; 480 miles of single and double track in operation, out of total of 2169 miles projected; all power for electrified lines of Midi system is produced in hydroelectric stations at 60,000 volts; program provides for establishment of total of 11 stations; 1500-volt d.c. is supplied to electric locomotives entirely by overhead lines of inclined catenary type.
French railway electrification
Elec. Rev
Electrical Review ; 102 , n 2630
1928
4 pages
10 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
French railway electrification
Engineering Index Backfile | 1933
|French railway electrification plans
Engineering Index Backfile | 1946
Electrification of the French Midi Railway
Engineering Index Backfile | 1924
|Engineering Index Backfile | 1943
|Engineering Index Backfile | 1923
|