Installation of geared turbines specially designed for cargo boats, making compact with its auxiliaries and simplifying erection and overhaul; results and steam consumption tests carried out with set erected at Turbina Works. (see also Shipbldg and Shipg Rec v 44 n 20 Nov 15 1934 p 529-31)
Geared steam turbine installation for tramp steamers
Inst Mar Engrs -- Advance Paper
Institute of Marine Engineers -- Meeting ; 1934 Geared
Institute of Marine Engineers -- Advance Papers ; 46 , Part 11
1934
9 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Geared steam turbine installation for tramp steamers
Engineering Index Backfile | 1934
|Geared steam turbine installations for tramp steamers
Engineering Index Backfile | 1934
|The ballasting of modern tramp steamers
Engineering Index Backfile | 1902
|The geared turbine channel steamers "Normannia" and "Hautonia."
Engineering Index Backfile | 1912
|The geared-turbine Ferry steamers "Curzon," "Hardinge" and "Elgin."
Engineering Index Backfile | 1913