Conversion of Pietermaritzburg-Glencoe section; complete electric system consists of 33,000-kw power station at Colenso, generating 3-phase, 50-cycle, 6600-v current; 88,000-v transmission system, 12 substations converting high-tension current to d-c line voltage of 3000; overhead contact line; locomotives; later Natal conversions.
South African railways electrification
Elec Ry Traction (Supp Ry Gaz)
1934
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
South African railways electrification
Engineering Index Backfile | 1926
Electrification of South African railways
Engineering Index Backfile | 1923
|Electrification of the South African railways
Engineering Index Backfile | 1919
|The electrification of the South African railways
Engineering Index Backfile | 1924
|The electrification of the South African railways -- The electric locomotives
Engineering Index Backfile | 1922