Plant in London area has throughput of 70 tpd by means of six bagging points and two bulk outlets; railway cars without hopper bottoms are brought to circular rail track between 75 ft wide concentric annular heaps; crawler crane feeds coal into reclaiming hopper and screen assembly which travels through 360° on third rail inside railway track, so that hopper is always adjacent to crane; reclaiming hopper is coupled to central hopper by 160 ft long radial conveyor. (See also Colliery Guardian v 209 n 5406 Nov 27 1964 p 724)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Coal-handling plant at Dagenham


    Weitere Titelangaben:

    Colliery Eng


    Erschienen in:

    Erscheinungsdatum :

    1964


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Coal-handling plant at Dagenham

    Engineering Index Backfile | 1964


    Ford factory at Dagenham

    Engineering Index Backfile | 1931


    Demand drives Dagenham

    British Library Online Contents | 2000


    Ford factory at Dagenham

    Engineering Index Backfile | 1931