Two-span skew bridge overcrossing highway has reinforced concrete slab supported by six welded steel girders 132 ft long; as it was important to cause minimum interference to heavy railway traffic, bridge deck was constructed on steel trestles parallel to, and about 43 ft away from its final position, and was then rolled-in and jacked down into place; whole work of inserting bridge deck, including track removal and replacement, shifting of surplus earth, and rolling-in, was accomplished during 27 hr shutdown of railway.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Construction of railway bridge at Boston Manor (Great Britain)


    Weitere Titelangaben:

    Acier-Stahl-Steel


    Beteiligte:
    Badby, D.W. (Autor:in)

    Erschienen in:

    Acier-Stahl-Steel ; 29 , n 10 ; p 453-455


    Erscheinungsdatum :

    1964


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Great Western Manor Class

    Waters, Laurence | SLUB | 2016


    Railway construction in Great Britain under war conditions

    Quartermaine, A.S. | Engineering Index Backfile | 1943


    Great Britain. A railway centenary

    Engineering Index Backfile | 1930


    Railway electrification in Great Britain

    Engineering Index Backfile | 1930


    Railway accidents in Great Britain

    Engineering Index Backfile | 1929