Account of modernization scheme according to which operating districts are being formed by merging existing 42 control districts in England and Wales, and in each of these new areas district operating manager is appointed with responsibility for all train running and for organization of passenger and freight services in his district.
L.M.S. Traffic control improvements
Engineer
Engineer ; 180 , n 4689
1945
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Traffic control on L.M.S. Railway
Engineering Index Backfile | 1945
Locomotive grate and smoke-box improvements on L.M.S. railway
Engineering Index Backfile | 1946
L.M.S. 4-6-0 Mixed Traffic Engines
Engineering Index Backfile | 1934
Engineering Index Backfile | 1935