Pedestrian and traffic control installation at unusual intersections; use of 3-phase program timber; automatic production of cycle changes.
How unusual intersection problems at Washington, D. C. were handled
Roads Streets
Roads and Streets ; 80 , n 3 ; p 37-41
1937
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Unusual ferry conversion handled by Newport news
Engineering Index Backfile | 1950
How mass transportation is handled in Washington, D.C.
Engineering Index Backfile | 1940
Predicting Unusual Right-turn Driving Behavior at Intersection
British Library Conference Proceedings | 2009
|Predicting unusual right-turn driving behavior at intersection
Tema Archiv | 2009
|