Construction operations on relocation of U S Highway no 78 bypassing Birmingham, Ala, and eliminating five grade crossings.
$1,000,000 bankhead highway improvement
Roads Streets
Roads and Streets ; 79 , n 12 ; p 37-40
1936
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1949
|$1,000,000 terminal complete at Houston
Engineering Index Backfile | 1928
|$1,000,000 Bus terminal opens in Chicagao
Engineering Index Backfile | 1928
Prototype Filling and Emptying System Measurements, New Bankhead Lock, Black Warrior River, Alabama
HENRY – Bundesanstalt für Wasserbau (BAW) | 1980
|Approximate hull dimensions for 500,000 and 1,000,000 dwt tankers
Engineering Index Backfile | 1967
|