On first run failures of wheels occurred; all fabricated wheels and axles are to be replaced by conventional types; each 4-car set consists of two electric motor coaches and two trailer coaches; upper and lower compartments "overlap" each other, or are staggered in longitudinal section; bodies are of lightweight all steel construction. See also Engineering Index 1949 p 161. (See also Engineering v 168 n 4372 Nov 11 1949 p 510-1)
Double-deck suburban electric train: British railways
Engineer
Engineer ; 188 , n 4894
1949
2 pages
Examples
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Double-deck suburban electric train: British railways
Engineering Index Backfile | 1949
Engineering Index Backfile | 1895
|Experimental British double-deck train
Engineering Index Backfile | 1949
Experimental British double-deck train
Engineering Index Backfile | 1949
Experimental British double-deck train
Engineering Index Backfile | 1949