Original tank has been in constant service for over 10 yr; two larger tanks were constructed during war to allow broader and more extensive research programs to be carried out on surface vessels, flying boats, high-speed planing hulls, and submerged bodies; detailed illustrated description of facilities of tanks No 2 and No 3; resistance testing. (see also Pac Mar Rev v 43 n 10 Oct 1946 p 59-61, 138, 140, 142)
New towing tank facilities at Stevens
Mar Eng Shipg Rev
Marine Engineering and Shipping Review ; 51 , n 9
1946
9 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New towing tank facilities at Stevens
Engineering Index Backfile | 1946
|Engineering Index Backfile | 1943
|Engineering Index Backfile | 1940
|Engineering Index Backfile | 1938
|Engineering Index Backfile | 1938
|