Illustrated report on replacement, on same site, of double track railroad bridge near St. Catharines, Ont, without interruption or diversion of train traffic; use of steel H and tubular steel piles driven to refusal and encased in Prepakt concrete cost little more than conventional methods.
New piers for railway bridge save $1,400,000
Roads Bridges
Roads and Bridges ; 85 , n 8
1947
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Scour Monitoring of Railway Bridge Piers via Inclination Detection
HENRY – Bundesanstalt für Wasserbau (BAW) | 2002
|Reconstruction of Windsor Bridge Piers
Transportation Research Record | 1996
|Reconstruction of Windsor Bridge Piers
Online Contents | 1996
|The Hackensack river bridge piers
Engineering Index Backfile | 1911
Reconstruction of Windsor Bridge Piers
Transportation Research Record | 1996
|