Bridge replacement on Central Railroad of New Jersey at Newark, N. J, using timber falsework traveling on wheels to carry completely assembled halves of new 6-track, 1050-ton steel plate girder railroad bridge with concrete deck; temporary track changes during demolition and replacement of bridge.
Falsework on wheels places railroad bridge in halves
Construction Methods
Construction Methods and Equipment ; 18 , n 6
1936
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bailey falsework for truss bridge repairs
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1893
Building a concrete bridge in halves
Engineering Index Backfile | 1914
EMAT evaluates railroad wheels
Tema Archiv | 1998
|TOUGHNESS TEST IN RAILROAD WHEELS
British Library Conference Proceedings | 2007
|