Bridge which replaces structure destroyed during last war, has overall length of 1198 ft and total weight of 5600 tons; three main girders adopted for fixed spans; movable spans carrying railway and road traffic are independent of each other; spans completely assembled in shop; bicycle and foot paths also provided.
New railway and highway bridge over Scheldt at Tamise, Belgium
Acier-Stahl-Steel
Acier-Stahl-Steel ; 21 , n 9
1956
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Le projet d'un aéroport sur la Tamise relancé
Online Contents | 2012
Construction of vehicular tunnels under Scheldt River at Antwerp, Belgium
Engineering Index Backfile | 1933
|Vopak crosses over the Scheldt
British Library Online Contents | 2007
Modelling Cohesive Sediments in the Scheldt Estuary (Belgium) with SEDI-3D
HENRY – Bundesanstalt für Wasserbau (BAW) | 2018
|STORAGE - Vopak crosses over the Scheldt
Online Contents | 2007