Review of report on Severn Barrage Scheme, published by HM Stationery Office, London, price 2s6d net; layout for tidal power plant now proposed consists of sluice dam, with 128 sluices; use of larger turbine units, with output of 25,000 kw each would permit number of units to be reduced to 32, in two turbine dams, each containing 16; it is considered that estimated time of construction could be reduced to 8 yr instead of 15 yr anticipated in 1933 reports. (See also Engineering v 159 n 4129 Mar 2 1945 p 171-2; Engineer v 179 n 4651 Mar 2 1945 p 164-6, n 4652 Mar 9 p 185-7; editorial comment p 172; Water and Water Eng v 48 n 587 Apr 1945 p 177-82)
Severn Barrage
Dock Harbour Authority
Dock and Harbour Authority ; 25 , n 294
1945