Experience of lines west of Buffalo in stabilizing 36,379 ft of track during last 4 yr, employing pneumatic method and relatively rich sand-cement grout, and small, flexible crews, 16 of which are being organized for work to be done during 1945; results cited show unstable conditions completely overcome, with savings over former maintenance costs and elimination of speed restrictions due to soft track. (see also Ry Age v 118 n 18 May 5 1945 p 787-9)
Roadbed grouting slashes maintenance of soft track on New York Central
Railway Eng Maintenance
Railway Engineering and Maintenance ; 41 , n 5
1945
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Roadbed grouting slashes maintenance of soft track on New York Central
Engineering Index Backfile | 1945
Pressure grouting stabilizes weak railway roadbed
Engineering Index Backfile | 1944
Construction of roadbed and track
Engineering Index Backfile | 1916
New York Central roadbed improvements in the vicinity of New York city
Engineering Index Backfile | 1905