Detailed account of record construction in 10 days, 4 hr and 45 min of single track, 1752-ft bridge across river at Wesel. (See also Ry Age v 118 n 17 Apr 28 1945 p 748-51)
Railroad over Rhine
Ry Eng Maintenance
Railway Engineering and Maintenance ; 41 , n 6
1945
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
|Construction of new railroad bridge over the Rhine at Ragaz
Engineering Index Backfile | 1928
|Raising the railroad bridge over the rhine between buchs and Schaan
Engineering Index Backfile | 1928
|Railway bridge over Rhine at Spyck
Engineering Index Backfile | 1945
Application Report - Owner Takes Over Repowered Rhine Freighter
Online Contents | 1993