Commentary on preliminary investigations in connection with design of new breakwaters; purpose was to form new entrance to port, farther out into estuary, to take place of old entrance which was built in 1852, and at same time to enclose considerable area of sea so as to provide room for future extensions to port. Before Instn Civ Engrs. (See also - n 292 Feb 1945 p 211-16)


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New breakwaters at port of leith


    Weitere Titelangaben:

    Dock Harbour Authority


    Beteiligte:
    Easton, J.D. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1945


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Port of Leith

    Engineering Index Backfile | 1928


    The Port of Leith

    Mowat | Online Contents | 1995


    Navigation lights for port of Leith

    Suthton-Jones, K.C. | Engineering Index Backfile | 1952