Summarized results of tests carried out under wide range of controlled conditions at Vienna Arsenal Thermal Testing Station in Great Britain; preheating characteristics of British Railway Mark 1 composite first and second class compartment coach and sleeper coach ascertained by tests; pre-heating time and current consumption requirements of coaches ascertained as function of ambient temperatures; representative values of overall heat transfer coefficient of modern railway coaches; data are expressed in continental metric units. (33442)
Pre-heating and cooling of railway coaches
IHVE J
1969
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Cooling railway coaches by refrigeration
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1950
|Engineering Index Backfile | 1905
Engineering Index Backfile | 1905
Engineering Index Backfile | 1928