The Claret and Wuillemier system, using the principle of bringing a live conductor into contact with successive sections of an insulated conductor laid between the rails, as operated in Lyons, France.
Electric railway system
St. Ry. Gaz
1894
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1895
Engineering Index Backfile | 1894
Engineering Index Backfile | 1894
Electric railway underground system
Engineering Index Backfile | 1894