Major results of recent researches are reported, being classified into running tests, rail welding, wooden tie and maintenance of track; running tests were conducted to investigate running stability of ruptured rail, dynamic effect of flat of wheel on track, dynamic stresses of prestressed concrete ties, dynamic behaviors of high embankment under high-speed traffic loading, and measurement of train wind at test section of new Tokaido line. (see also Int Ry Congress Assn -- Monthly Bul v 42 n 3 Mar 1965 p 159-66)
Railway track structure for high-speed train operation
Tokyo. Ry Tech Research Inst -- Quarterly Report
Tokyo. Railway Technical Research Institute -- Quarterly Report ; Special Issue
1964
6 pages
Report
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Railway track structure for high-speed train operation
Engineering Index Backfile | 1965
|Railway track construction and train operation
Engineering Index Backfile | 1943
|Numerical simulation of train-track-structure interaction for high speed railway systems
British Library Conference Proceedings | 2003
|Train operation control system for high-speed railway
Tema Archiv | 1978
|High-speed and high-congestes train operation in railway systems
Tema Archiv | 1991
|