Project on Germantown and Chestnut Hill suburban line, including elevation of two tracks for distance of 1.8 mi; other improvements; construction of two passenger stations, new local freight-handling facilities, and two long freight lead tracks; work carried out simultaneously with electrification of line which was handled as separate project; work, exclusive of electrification cost $1,800,000.
Large grade separation project completed on reading
Ry Age
Railway Age ; 95 , n 20
1933
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2009
Stormwater project for Saudi stations completed
Online Contents | 2015
Semi-sub project completed in Gibraltar
Online Contents | 2012
Grade separation project in St. Louis
Engineering Index Backfile | 1933
|Another large railroad bridge completed
Engineering Index Backfile | 1917