Project on Germantown and Chestnut Hill suburban line, including elevation of two tracks for distance of 1.8 mi; other improvements; construction of two passenger stations, new local freight-handling facilities, and two long freight lead tracks; work carried out simultaneously with electrification of line which was handled as separate project; work, exclusive of electrification cost $1,800,000.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Large grade separation project completed on reading


    Weitere Titelangaben:

    Ry Age


    Erschienen in:

    Railway Age ; 95 , n 20


    Erscheinungsdatum :

    1933


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    SAFEDOR project completed

    Online Contents | 2009




    Grade separation project in St. Louis

    Bowen, L.R. | Engineering Index Backfile | 1933


    Another large railroad bridge completed

    Engineering Index Backfile | 1917