Docks of London and North Eastern Railway installed 37 large cranes of level luffing type; 33 have lifting capacity of 3 tons, and four of 5 tons; each crane equipped with one motor for each motion, namely, hoist, slew, luff and travel, supply being 400 v d-c.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    New electrically-operated cranes at middlesbrough docks, L.N.E.R.


    Weitere Titelangaben:

    Ry Gaz


    Erschienen in:

    Erscheinungsdatum :

    1933


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Electrically-operated Mobile cranes

    Engineering Index Backfile | 1934


    Electrically-operated transporter wharf cranes

    Engineering Index Backfile | 1929


    Cranes for dry docks

    Engineering Index Backfile | 1933


    L.N.E.R. locomotive conversions

    Engineering Index Backfile | 1942