Method of laying prefabricated panels of track in 40-ft lengths on new main line to Mozambique; Rhodesian section of line is laid with 80-lb rails on steel ties and is ballasted with stone at rate of 1600 cu yd mi ties.
South east connection, Rhodesia railways
Ry Gaz
Railway Gazette ; 104 , n 16
1956
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
|The Rhodesia railways in South Africa
Engineering Index Backfile | 1906
|The Rhodesia railways, limited
Engineering Index Backfile | 1905
Engineering Index Backfile | 1899
Engineering Index Backfile | 1946
|