To solve problems of need for larger drainage opening under track on Great Northern Railway, liner plates for 120-in. culvert were installed by tunneling operation using special jacking frame; additional opening through fill permitted water levels on each side of track to be equalized more quickly, eliminating possibility of washouts.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Poling plates help get big culvert through fill


    Weitere Titelangaben:

    Ry Track Structures


    Erschienen in:

    Erscheinungsdatum :

    1958


    Format / Umfang :

    2 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Jacking culvert through railway fill aided by top shield

    Tunnicliff, N.H. | Engineering Index Backfile | 1928


    Crawler crawling robot for detection of culvert with top-fill

    TANG LI / ZHANG YUNGUANG / HE SHAOBO et al. | Europäisches Patentamt | 2020

    Freier Zugriff

    Analysis Research on Little Curvature Arch Bar of High Fill Culvert

    Wang, W.-H. / Ju, Y.-H. / Zhao, W.-D. et al. | British Library Conference Proceedings | 2010


    Culvert hydraulics

    Engineering Index Backfile | 1953


    Culvert Hydraulics

    Hotchkiss, Rollin H. / Thiele, Elizabeth A. / Nelson, E. James et al. | Transportation Research Record | 2008