Outline of plan for relocation of Pacific Highway U S 99 necessitated by construction of Shasta Dam, involving erection of new steel truss highway bridge 3600 ft long, 500 ft above bed of Pit River.
State joins U. S. in $3,200,000 contract for highway relocation around Shasta Dam reservoir
Calif Highways Public Works
California Highways and Public Works ; 17 , n 11
1939
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rail relocation around Shasta reservoir
Engineering Index Backfile | 1939
Railroad relocation around Shasta Dam
Engineering Index Backfile | 1938
Railroad relocation and construction around shasta dam
Engineering Index Backfile | 1941
|Railroad relocation and construction around Shasta Dam
Engineering Index Backfile | 1941
|Relocation of U.S. 99, around Shasta Dam reservoir site completed and opened to public traffic
Engineering Index Backfile | 1943
|