Experiences of Birmingham, Ala., Railway, Light and Power Co. with number of types of track construction in effort to reduce surface maintenance expense. Most satisfactory service is said to have been obtained with rigid concrete substructure and vitrified brick paving, wherein paving between rails is so crowned that bricks adjacent to rails fit in underneath heads of T-rails avoiding use of any nose blocks.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Track construction from the paving maintenance standpoint


    Weitere Titelangaben:

    Elec. Ry. Jl


    Erschienen in:

    Electric Railway Journal ; 55 , n 12 ; p 569-571


    Erscheinungsdatum :

    1920


    Format / Umfang :

    3 pages


    Anmerkungen:

    7 Figs.


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :



    Locomotive design from a maintenance standpoint

    Winterrowd, W.H. | Engineering Index Backfile | 1917


    Vehicle design from maintenance and operating standpoint

    Faulkner, F.L. | Engineering Index Backfile | 1934


    Vehicle design from maintenance and operating standpoint

    Faulkner, F.L. | Engineering Index Backfile | 1937


    Vehicle design from maintenance and operating standpoint -- II

    Faulkner, F.L. | Engineering Index Backfile | 1935