Describes construction of 3 1/2 mi. 40-ft. main highway between Jersey City and Newark. Notes on eliminating grade crossings; longitudinal and transverse drainage on level alignment; making 300,000-yd. embankment on marsh, duplex concrete plant, etc.
Newark turnpike improvement
Public Works
Public Works ; 48 , n 20 ; p 459-463
1920
5 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1958
|Engineering Index Backfile | 1940
|Engineering Index Backfile | 1969
|Engineering Index Backfile | 1940
|Engineering Index Backfile | 1946