Outline of work performed by Canadian Pacific Railroad during time of Red River Flood in Apr and May 1950; despite loss of 20 mi of track, Railroad moved 26,000 evacuees by rail and 175 by air from Winnipeg, accommodated 300 daily victims in its Royal Alexandra Hotel, handled 5000 telegrams per day, "highballed" all flood fighting material, and helped in record livestock rescue.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    C.P.R. experiences in Manitoba flood


    Weitere Titelangaben:

    Can Transportation



    Erscheinungsdatum :

    1950


    Format / Umfang :

    6 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch


    Schlagwörter :


    Speeding production of railway ballast for C.P.R. in Manitoba

    Cowan, F.C. | Engineering Index Backfile | 1953


    C.P.R. diesel-electric switchers

    Engineering Index Backfile | 1944


    Crowsnest line, C.P.R.

    Livesay, E.H. | Engineering Index Backfile | 1948


    C.P.R. air-line activities

    Engineering Index Backfile | 1942


    C.P.R. tunnel at Quebec

    Engineering Index Backfile | 1942