System installed on 42 mi of single track and 1 mi of double track between Montpelier, Ohio, and New Haven, Ind; project includes power operated switches and controlled signals at ends of four passing tracks, namely, Blakesley, Butler, Spencerville and Grabill, capacities of which are 120, 170, 123 and 115 cars, respectively.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    C.T.C. on Wabash


    Weitere Titelangaben:

    Ry Signaling Communications


    Erschienen in:

    Erscheinungsdatum :

    1950


    Format / Umfang :

    4 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Maintenance of C.T.C. on Wabash

    Engineering Index Backfile | 1932


    Virginian installs C.T.C.

    Engineering Index Backfile | 1943


    C.T.C. on reading

    Hillig, J.E. | Engineering Index Backfile | 1950


    C.T.C. down by Ohio

    Engineering Index Backfile | 1947


    Virginian installs C.T.C.

    Engineering Index Backfile | 1943