New York, New Haven and Hartford Railroad has completed initial section of extended territory on which color light signals are to replace three-aspect semaphores; fourth and fifth aspect required where distances are short between inter-lockings in dense traffic territory; new system obviates line control wires as aid in conservation of critical war materials.
New Haven installs five-aspect signaling controlled by coded track circuits
Ry Signaling
Railway Signaling ; 36 , n 1, Part 1 ; p 32-39
1943
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New Haven installs modern signaling
Engineering Index Backfile | 1927
New Haven installs ignitron M-U cars
Engineering Index Backfile | 1954
|New Haven installs ignitron M-U cars
Engineering Index Backfile | 1954
|New Haven installs all-relay interlocking at Providence, RI
Engineering Index Backfile | 1947
Big four installs signaling on 45 Miles of double track
Engineering Index Backfile | 1931