How this road expedited train movements with increased safety by installation of centralized traffic control on 88 mi of single and double track between Meadville Junction, Pa, and Filer, distance of 42.9 mi.
Bessemer and Lake Erie installs centralized traffic control
Ry Age
Railway Age ; 114 , n 9
1943
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
C.T.C. on Bessemer and Lake Erie
Engineering Index Backfile | 1943
Train communication installed on bessemer and Lake Erie
Engineering Index Backfile | 1940
Twenty locomotives for the Bessemer and Lake Erie
Engineering Index Backfile | 1916
Pennsylvania installs centralized traffic control
Engineering Index Backfile | 1942
Pennsylvania installs centralized traffic control
Engineering Index Backfile | 1942