In view of present day achievements in rapid construction author believes that 10-yr scheme may be feasible after war instead of 20 yr suggested in Weir Report.
Railway electrification
Elec Rev
Electrical Review ; 131 , n 3393
1943
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1956
|Engineering Index Backfile | 1923
|Engineering Index Backfile | 1909
|Engineering Index Backfile | 1909
|Engineering Index Backfile | 1931