Glenn L. Martin Co maintains corps of 40 expediters to work with parts and subassembly makers to speed flow of bombers to war fronts.
Boosting bomber production by subcontracting
Aviation
Aviation ; 42 , n 12 ; p 221 + 223 + 225 + 227
1942
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1943
Engineering Index Backfile | 1943
|Engineering Index Backfile | 1943
Engineering Index Backfile | 1935
Engineering Index Backfile | 1942
|