Westinghouse Electric Corp's new plant at Athens, Ga is laid out for straight-through flow of materials from receiving to shipping floor; almost 5 mi of materials-handling equipment of various kinds include in-floor tow lines, overhead monoveyors, power and free conveyors, and many special racks, trucks, and transfer devices.
Hands-off theme keynotes new transformer plant
Iron Age
Iron Age ; 183 , n 14 ; p 78-79
1959
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
IEEE | 2024
Strength keynotes liner's design
Engineering Index Backfile | 1948
|Mystic switching station design keynotes simplicity, reliability
Engineering Index Backfile | 1944
|