Control and monitoring of operations from central station by closed-circuit TV cameras installed at major ramp areas; installation of traffic control devices along reversible-direction section of Seattle Freeway, including motorized gates, barriers and changeable-message illuminated signs; transmission of operational signals by composite communication cables with coaxial core.


    Zugriff

    Zugriff über TIB

    Verfügbarkeit in meiner Bibliothek prüfen


    Exportieren, teilen und zitieren



    Titel :

    Central control operates 12-lane freeway


    Weitere Titelangaben:

    Elec Construction Maintenance


    Beteiligte:
    Sparling, T.E. (Autor:in)

    Erschienen in:

    Erscheinungsdatum :

    1966


    Format / Umfang :

    3 pages


    Medientyp :

    Aufsatz (Zeitschrift)


    Format :

    Print


    Sprache :

    Englisch




    Freeway Lane Drops

    D. N. Goodwin | NTIS | 1976


    Modeling Freeway Lane Changing Behavior

    Koutsopoulos, H. N. / Ben-Akiva, M. E. / Ahmed, K. I. et al. | British Library Conference Proceedings | 1996


    Investigation of freeway lane drops

    Goodwin, D. N. / Goodwin, B. C. | TIBKAT | 1972


    Freeway Work Zone Lane Capacity

    A. Drakopoulos / T. Notbohm / A. Dehman | NTIS | 2009


    Evaluation of Express Lane Effectiveness in Freeway to Freeway Interchanges

    J. W. Hanks / K. Barnes / J. M. Mounce | NTIS | 1992